After we went through lock 12 at Whitehall we tied up at the town wall for the night. There was only one other small boat from VT there.
The next stop was Ft Edwards. Here we ran into David and Brian from Plattsburg again. we tied up to the free town pier and were treated to a soft rock concert and another fireworks show. Again we had a front row seat. We left before David and Brian in the morning and headed south. There is still a lot of barge work going on in this area. GE is running some PCB superfund cleanup here and it is a huge project.
With the exception of the barge and the commercial traffic the entire Champlain canal is calm and picturesque.